In order to move forward, I think it’s important for us
to consider a Management Expectations Matrix.
The matrix has 3 columns and 3 rows.
The 3 columns are Max or Min (this measures success and is considered
the most important for a project), Constrain (the second most important), and
the third is Accept (the least important).
The rows are Cost (how much is the project going to cost), Schedule
(what’s the deadline), and Scope and Quality (what is the scope or goal).
I think that Scope is the most important aspect for us to
consider. What is the scope of this
project..to have a successful Winery, make decent profit, and allow your
children and grandchildren the opportunity to run a successful business. The second most important would be the
schedule, and third is the cost.